« This is all I have energy to post. (its video) | Main | Few pics. »
Monday
Oct262009

Huge Day Tomorrow.....in list form.

  1. start work at 6am
  2. launch the 38' Northern Bay at 7am
  3. start testing systems (water maker, genset, air conditioner, etc...)
  4. CAT mechanic arrives to check out engine.
  5. steam boat to Rockland from wheeler's bay.

while we are dealing with the newly launched boat......

  1. crane arrives at shop
  2. pick up engine and set into the 32' Osmond
  3. get blocking set up to move engine around

and if that isn't enough..........

  1. move second 38' Northern Bay into the shop
  2. bring radar arch (for Northern Bay #1) to rockland
  3. crane arch onto boat
  4. run all the wires
  5. continue to test systems (lighting, water systems, electronics, etc..)
  6. solve problems
  7. find problems
  8. rinse
  9. repeat

new pics are up in the BOATS IN THE SHOP section, if things go according to plan I should have lots of good pics tomorrow.  calling it a day, rest up for what is sure to be a long and difficult day.  later.

Reader Comments

There are no comments for this journal entry. To create a new comment, use the form below.

PostPost a New Comment

Enter your information below to add a new comment.

My response is on my own website »
Author Email (optional):
Author URL (optional):
Post:
 
Some HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>